New gas pipeline from Ukraine to Poland soon will be buildt.
The length of the new gas pipeline interconnector from Ukraine to Poland will be about 100-110 kilometers. The pipe will be built between the gas-measuring station " Drozdovychi " on the border, and compressor station " Bilche - Volytsya". Amount of pumped gas is from 4 to 8.3 billion cubic meters of gas per year, depending on the diameter of the pipe . On this will also depend the cost of the project. According to preliminary estimates , it will make 183-244 million USD with VAT . The main direction of the pipeline - from Poland to Ukrainian natural gas pipelines and storage " Bilche - Volytsya ", " Opara ," " Dashava ", " Ugersko" but it will be possible and the reverse option - from Ukraine to Poland .